1st Frame made!!!! so happy.


The welding of the floor fixings has caused them to warp slightly because of the heat.


This screw top was devised to fasten the cross bar across the top. This wasn't welded as I want the frames to be completely portable.



The corridor is slowly growing!!!


Completion of the welding and the corridor is up!! (I mock fitted the corridor to see what it looked like)
The next stage of the process is sourcing the lights and getting them fitted onto the frames! I am searching for some sort of sponsorship to keep the costs down on this project.


The floor was deceptively uneven so the frames look a bit wonky during mock up.
Initial thoughts about this are that i hope the floor in the space is even otherwise i could face some difficulties during final set up!