Thursday, 28 April 2011

Light Corridor Realisation IV

I've obtained some lights as i have previously stated! here they are before construction:


lights fitted, connected to motion sensors.


Lights wired up! partial lights on!


Side View!


the side of the inside!


All lights working! apart from a faulty tube at the left of the end of the corridor!


Now to set up in the studios so that i can tinker with the sensors settings!

I will have to wait until the floor has been polished so that there will be a brilliant reflection across the floor from the lights!

No comments:

Post a Comment